Abstract:
Productivity improvement is an important aspect for any organization to survive and to achieve a
competitive edge. So increasing productivity should be a big task for tomorrow. The study is
aimed at finding ways to increase productivity for the manufacturing company and will make
standard time development on the die changing process. For this, the study was done using workstudy
techniques. Work-study is a generic term for those techniques which are used in the
examination of human effort in its entire context and which lead to a systematic investigation of
all the factors affecting the efficiency and economy of a situation under review to effect
improvement. Work-study has two parts: method (motion) and time study. By using method and
time study procedures, it is done by looking at each method and measuring the time it takes for
the production company to use it. Relevant data were collected using the direct observation
method and the queries were unstructured questionnaires. To see how productivity has grown,
using arena simulation software and also for developing the proposed method and exit method
flow process chart. In this study, by solving the problem of belling machine, by automating the
pipe transportation method and pipe downloading method, it was possible to increase the
productivity of at least 45 bell pipes per day. It is also possible to avoid the cost of the operator's
payment and the fatigue of the operator. Another is that by maintaining standard time, the
maintenance team productivity has been increased by reducing the wastage of less than 16% of
the time spent on the die changing process for various reasons. In general, the use of work-study
techniques can significantly increase productivity.