BDU IR

Investigating Barriers of 5S Implementation Using Fuzzy Interpretive Structural Modeling and Path Analysis (Case Study: Bahir Dar Textile Share Company, BDTSC)

Show simple item record

dc.contributor.author Hunie, Asrat
dc.date.accessioned 2022-11-25T06:52:59Z
dc.date.available 2022-11-25T06:52:59Z
dc.date.issued 2022-03-15
dc.identifier.uri http://ir.bdu.edu.et/handle/123456789/14558
dc.description.abstract Maintenance as critical method to improve productivity and Total Productive Maintenance (TPM) as functional discipline towards the management of physical asset and enhancing overall equipment effectiveness (OEE) paid attention. In one hand, despite of its critical significance; maintenance has been given little attention in Ethiopia on the other hand previous works particularly to TPM was only on its building blocks. None of such works tried to construct TPM implementation framework by investigating TPM implementation barriers and identifying causal relationship. Therefore, this study aims to investigate barriers that affect the implementation of TPM and develop TPM implementation framework. Literatures were reviewed to identify major barriers. Questionnaire were prepared and used to collect data. A non-random sampling method followed for the questionnaire and hypothesis proposed particularly to the foundational element 5Ss. Fuzzy Interpretive Structural Modeling (FISM) and structural equation modeling (SEM) deployed respectively to investigate barriers with its casual relationships and validating the correlation. Barriers then clustered using MICMAC analysis and FISM result showed the ranks of barriers from higher deriving powers such as culture resistance (CR), employee Resistance (ER), and lack of motivation (LM) up to lower deriving power such as lack of reward mechanism (LRM). Furthermore, FISM result also confirmed the importance of 5S implementation success to TPM intermediate output. All hypotheses found statistically significant and finally, a three-stage TPM implementation framework proposed as a result. Keywords: 5S, Barrier, FISM, Investigation, OEE, SEM, TPM en_US
dc.language.iso en_US en_US
dc.subject Mechanical and Industrial Engineering en_US
dc.title Investigating Barriers of 5S Implementation Using Fuzzy Interpretive Structural Modeling and Path Analysis (Case Study: Bahir Dar Textile Share Company, BDTSC) en_US
dc.type Thesis en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record