BDU IR

Evaluating Structural Plan Implementation and the Drivers of Plan Reality Divergence in Adama City, Ethiopia

Show simple item record

dc.contributor.author ALEMU, BEKELE
dc.date.accessioned 2026-11-10T06:13:29Z
dc.date.available 2026-11-10T06:13:29Z
dc.date.issued 2026-08
dc.identifier.issn issn
dc.identifier.uri http://ir.bdu.edu.et/handle/123456789/17687
dc.description.abstract Rapid urbanization in Ethiopia has increased the need for effective urban planning and implementation to guide land use, infrastructure development, and sustainable urban growth. However, the preparation and adoption of urban plans do not necessarily result in their effective implementation, creating divergence between planned and actual urban development. This study evaluated the implementation of the Adama City Structure Plan (2017–2027), examined the extent of conformity between planned and implemented land uses, identified the major factors contributing to plan–reality divergence, and assessed the effectiveness of the strategies used for plan implementation. A mixed-methods case study approach was employed, combining a household survey of 384 households selected through systematic random sampling with purposively selected key-informant interviews, field observations, spatial mapping, and review of planning and administrative documents. The findings reveal substantial variation in implementation across land-use categories. Residential land use achieved 79.71% implementation, while commercial land use achieved only 44.62%. In contrast, administrative, service, transport, recreation and environmental, and manufacturing and storage uses exceeded their planned allocations in varying degrees, indicating both under-implementation and over implementation. Field and spatial evidence further revealed encroachment of informal settlements into planned green and open spaces, riverbank areas, and manufacturing zones, as well as deviations in planned road and transportation corridors. The major factors contributing to these divergences were inadequate financial and budgetary resources, lack of approved local development plans, limited public awareness and stakeholder participation, weak development control and enforcement mechanisms, inadequate professional and leadership capacity, weak institutional coordination, limited experience-sharing, ineffective monitoring and evaluation, and poor prioritization and sequencing of implementation activities. The study further found that existing implementation strategies are conceptually appropriate but only partially effective because they lack sufficiently operational mechanisms, measurable indicators, clear institutional responsibilities, predictable financing, and effective monitoring arrangements. The study concludes that improving structural plan implementation requires an implementation-oriented framework that strengthens institutional and technical capacity, links planning with budgeting and investment programs, prepares and approves local development plans, strengthens land-use enforcement, enhances continuous stakeholder participation and public awareness, and en_US
dc.language.iso en en_US
dc.title Evaluating Structural Plan Implementation and the Drivers of Plan Reality Divergence in Adama City, Ethiopia en_US
dc.type Thesis en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record