BDU IR

EVALUATING COST OF POWER OUTAGES AND PRODUCTION INTERUPTIONS ON ETHIOPIA‘S CEMENT INDUSTRIES

Show simple item record

dc.contributor.author TAMRAT, BIRMETA
dc.date.accessioned 2022-11-29T07:21:48Z
dc.date.available 2022-11-29T07:21:48Z
dc.date.issued 2022-08
dc.identifier.uri http://ir.bdu.edu.et/handle/123456789/14580
dc.description.abstract Power interruptions, outages and load shading are some of the challenges the manufacturing industries in Ethiopia facing. In this paper the impact of power outages in selected cement plants in Ethiopia is studied. The methodology employed in this paper are Direct output loss and other losses using company‗s four years data (2016 to 2019) record data and Indirect method using willingness to pay by choice experiment method to measure the cost imposed by power outages. Estimating the true opportunity costs to the enterprises using decision matrix from lost production caused by power outages is used in determination of the feasibility of mitigating measures. Based on the findings all the variables studied like frequency of outage, duration of outage and type of outage are found to have significant impact on the companies productivity and profitability and they are willing to pay extra to minimize the power interruption and duration. The result of the study shows that the five companies lost 5,547 hrs of operation due to power loss and it is estimated to be a total of 90 million birr due to idle manpower over the course of four years and also their labor productivity only by power interruption went down on average by 3.5% and a total of 1 million ton of cement is not supplied to the market. When it comes to willingness to pay the companies are willing to pay 1.07% additional cost for a reduction of frequency of outage by 1 and willing to pay 13.3% more for a reduction of the duration by 1hr. and 0.5% more payment for a prior notification before the outages. Keywords: Choice experiment, Power outage, Willingness to pay, Conditional Logit, Loss en_US
dc.language.iso en_US en_US
dc.subject MECHANICAL AND INDUSTRIAL ENGINEERING en_US
dc.title EVALUATING COST OF POWER OUTAGES AND PRODUCTION INTERUPTIONS ON ETHIOPIA‘S CEMENT INDUSTRIES en_US
dc.type Thesis en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record