BDU IR

ESTIMATION OF RIBB DAM CATCHMENT SEDIMENT YIELD AND RESERVIOUR EFFECTIVE LIFE USING SWAT MODEL & EMPRUCAL METHODS

Show simple item record

dc.contributor.author EZEZEW, GETALEM
dc.date.accessioned 2020-03-16T06:40:42Z
dc.date.available 2020-03-16T06:40:42Z
dc.date.issued 2020-03-15
dc.identifier.uri http://hdl.handle.net/123456789/10286
dc.description.abstract The Ribb dam is one of the irrigation projects in the Upper Blue Nile basin, Ethiopia, to irrigate the Fogera plain. Reservoir sedimentation is a major problem, because it reduces the useful reservoir capacity by accumulation of sediments coming from the watersheds. Estimates of sediment yield are needed for studies of reservoir sedimentation, and planning of soil and water conservation measures. The objective of this study was to simulate the Ribb dam catchment sediment yield using SWAT model and to estimate Ribb reservoir effective life according to trap efficiency methods. The Ribb dam catchment is found in North Western part of Ethiopia highlands and it belongs to the upper Blue Nile and Lake Tana basins. Soil and Water Assessment Tool (SWAT) was selected to simulate flow and sediment yield in the Ribb dam catchment. The Model sensitivity, calibration and validation analysis at Ambo Bahir site were performed with Sequential Uncertainty Fitting (SUFI-2. The flow data at this site was obtained by transforming the Lower Ribb gauge station (2002-2013) flow data using Area Ratio Method. The sediment load was derived based on the sediment concentration yield curve of Ambo site.). Stream flow results showed that the NashSutcliffe efficiency coefficient (NSE) was 0.81 and the coefficient of determination (R2) was 0.86 in calibration period (2004-2010) and, 0.74 and 0.77 in validation period (2011-2013), respectively. Using the same periods, the NS and R2 for the sediment load calibration were 0.85 and 0.79 and, for the validation, it became 0.83 and 0.78 respectively. The simulated average daily flow rate and sediment yield generated from Ribb dam watershed were 3.38 m3/s and 1772.96 tons/km2/yr respectively. The effective life of Ribb reservoir was estimated using the developed empirical methods of the Brune (1953), Churchill (1948) and Brown (1958) methods and found to be 30, 38 and 29 years respectively. To conclude, massive sediment comes from the steep slope agricultural areas, and approximately 98-100% of this incoming annual sediment loads have been trapped by the Ribb reservoir. In Ribb catchment as well as reservoir systematic and thorough consideration of technical, social, environmental, and catchment managements and practices should be made to lengthen the useful life of Ribb reservoir. en_US
dc.language.iso en en_US
dc.subject Hydraulic engineering en_US
dc.title ESTIMATION OF RIBB DAM CATCHMENT SEDIMENT YIELD AND RESERVIOUR EFFECTIVE LIFE USING SWAT MODEL & EMPRUCAL METHODS en_US
dc.type Thesis en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record